Sheffield City Centre Heat Network Diversions
Veolia Environmental Services UK · City Centre, Sheffield · 2026
Veolia Environmental Services UK (Sheffield) appointed Valmech, part of OCU Group, to undertake diversion works at Surrey Street and Norfolk Street for a programme of heat network upgrades across the city to strengthen resilience within the existing network and support future customer connections. The works focused on diverting an existing heat network main away from a known weak point, allowing network operation to be maintained while remedial works were carried out.
Solution: Developed a detailed isolation and tie-in strategy aligned to Veolia’s operational requirements, ensuring all critical works were completed within planned night-time shutdown windows Sequenced construction activities to minimise disruption to businesses and pedestrians, supported by clear traffic management, signage, and local stakeholder engagement Coordinated activities to safely complete tie-ins within a live urban environment
Outcome: Successfully diverted the existing heat network main away from a known weak point, improving network resilience and reducing risk of future failure Maintained network operation while remedial works were undertaken Delivered 250m of new UDHN pipework and associated large diameter connections within a challenging city-centre environment Enhanced long-term network capacity and flexibility, supporting Veolia’s wider programme of heat network upgrades across Sheffield Delivered works safely and efficiently through effective planning, stakeholder coordination and controlled execution
Radford Wastewater Treatment Project
Radford, Devon · South West Water · 2026
Purestream, part of OCU Group, delivered a major wastewater treatment upgrade for South West Water in Radford, Plymstock, under the AMP7 framework. The project was driven by the need to achieve statutory compliance while also increasing treatment capacity and improving effluent quality. By integrating MEICA, civils, and modular treatment technologies, the scheme provided a turnkey solution within just 12 months, demonstrating collaboration, adaptability and in-house expertise.
Solution: Full MEICA and civils provision delivered, including design, delivery, build and commissioning Installation of a side-stream plant to boost treatment capacity by 68 l/sec (serving 6,500 PE) Deployment of modular treatment technologies (DAF, SAF, MBBR, Lamella clarifiers) supplied by Purestream Partnership with local Devon and Cornwall businesses for SAF and MBBR construction, supporting the regional economy Strategic adaption to project changes, pivoting from temporary hire to a permanent installation strategy
Outcome: Statutory compliance achieved with excellent effluent quality (BOD, SS and ammonia consents met) Increased treatment capacity and resilience for the local community Project successfully delivered from concept to commissioning in under 12 months Strong engagement with local supply chains, demonstrating collaborative success Provided a full turnkey service by integrating OCU’s MEICA and civils expertise with Purestream’s treatment technologies