Grimsby Solar Park – Civil Engineering and Renewable Energy Infrastructure
Confidencial · Grimsby, United Kingdom · 2026
CLS Civil Engineering delivered a £2.2 million civil engineering and construction project for Grimsby Solar Park, providing essential infrastructure to support renewable energy development. The project involved the construction of extensive access roads, a large construction compound, ducted road crossings, precast concrete table foundations, culverts and transformer foundations. A significant part of the work included installing approximately 15,000 metres of deer fencing to secure the development site. The project required coordinated delivery of multiple civil engineering activities to establish the infrastructure necessary for the wider solar park installation. CLS provided an integrated construction solution covering site access, foundations, drainage and supporting infrastructure, demonstrating its expertise in large-scale renewable energy projects.
Solution: CLS implemented a comprehensive civil engineering and construction programme covering all major infrastructure requirements.
Outcome: CLS delivered a £2.2 million infrastructure package, providing the essential access, foundation, drainage and site security components required for the Grimsby Solar Park development. The project demonstrates CLS's ability to deliver complex civil engineering works for renewable energy infrastructure, combining multiple construction disciplines within a single project.
Siemens Keadby 2
Siemens · Keadby, North Lincolnshire, United Kingdom · 2026
CLS Civil Engineering successfully undertook a £3.8 million civil engineering and groundworks package for the Siemens Keadby 2 power station development in North Lincolnshire. The project involved extensive site preparation, excavation, concrete breakout, aggregate distribution and ground levelling to prepare the site for major industrial construction activities. A significant element of the project was breaking out approximately 15,000m² of existing foundations and concrete slabs, including crushing operations. CLS also imported and distributed approximately 30,000 tonnes of aggregate material to support ground preparation and construction requirements. Additional activities included large-scale cut-and-fill operations around the cooling tower area, levelling existing materials across the site installation area and stripping topsoil throughout the development site. The project showcased CLS's expertise in managing large-scale industrial groundworks, material processing and complex site preparation operations.
Solution: CLS delivered an extensive groundworks package using its civil engineering expertise, workforce and plant resources. The scope of work included: Breaking out and crushing 15,000m² of existing foundations and slabs. Importing, spreading and levelling 30,000 tonnes of aggregates. Carrying out 17,000m² of cut-and-fill operations in the cooling tower area to a depth of 1.50 metres. Levelling 49,000m² of existing material across the site installation area. Stripping 50,000m² of topsoil across the site. Breaking out an additional 5,000m² for the test pile area. Supplying site cabins, fencing, wheel washes and barriers.
Outcome: CLS delivered the £3.8 million civil engineering package, completing substantial site preparation, earthworks and temporary infrastructure activities for the Siemens Keadby 2 development. The project demonstrates CLS's ability to manage large industrial construction packages, handle significant material volumes and deliver complex groundwork operations to support major infrastructure developments.